In the 1960s and 1970s, high-profile art exhibitions in prestigious American museums frequently included work by women artists.
Answer Choices:
TrueFalse
Answer: False
Yinka Shonibare’s Mr. and Mrs. Andrews without Their Heads is a parody of a work by _____.
Answer Choices:
ConstableGainsboroughGolubWalker
Answer: Gainsborough
Ceramics, glass, jewelry, weaving, and woodworking are categorized as _____.
Answer Choices:
kitschartifacts/ethnic artcraftsfine art
Answer: crafts
Extra Credit: The Great Pyramids in Egypt have large interior chambers that were used for public burial rituals.
Answer Choices:
TrueFalse
Answer: False
An equestrian sculpture is one that includes a _____.
Answer Choices:
caryatidceremonial maskelements of naturehorse
Answer: horse
Tomatsu Shomei’s photographs are of victims of _____.
Answer Choices:
torturethe plaguemercury poisoningthe atomic bomb
Answer: the atomic bomb
Guernica was a temporary memorial honoring the victims of September 11.
Answer Choices:
TrueFalse
Answer: False
Animation grew out of _____, in which a series of drawn images seem to move as book pages are flipped rapidly.
Answer Choices:
flip bookscomic booksstereoscopescartoons
Answer: flip books
Judy Chicago and Nancy Spero have in common?
Answer Choices:
a preference for expressing themselves in performance art.none of the optionsan interest in feminism.an interest in making site-specific artwork.
Answer: an interest in feminism.
Extra Credit: Which civilization was ruled by warrior-priests from 150–800 CE and extended for more than 400 miles along the Pacific Ocean in what is now modern Peru?
Answer Choices:
IncaMayaMocheAztec
Answer: Moche
A calendarized budget is calculated by each week to pay for costs as they occur. What does the resulting report generate?
Answer Choices:
Release of resourcesProject closureContract closureCost flow requirements
Answer: Cost flow requirements
Ject in Neshat’s art is Islamic women and femininity in a country where women’s actions and rights are limited by law.
Answer Choices:
TrueFalse
Answer: True
Extra Credit: Ritual tattooing was often used on the eastern islands of the South Pacific as part of initiation rites that prepared an individual for adulthood.
Answer Choices:
TrueFalse
Answer: True
A city project to build a soccer complex with six fields is in the planning phase of the project life cycle. One of the project team members shares details from a project he worked on to build two soccer fields completed a year ago. Which estimation method should the project team use for the new project?
Answer Choices:
Top-downBottom-upTemplateRatio
Answer: Ratio
A project team is gathered together to begin the planning process to create a new website for its client. One of the project team members is a code specialist and will provide the necessary information for the associated coding activities. What estimating technique will be used?
Answer Choices:
ParametricOne-pointThree-pointAnalogous
Answer: Analogous
The project team is determining the duration for upgrading the software on the app used on its mobile devices. A technician indicated it takes approximately 15 minutes per mobile device. With four technicians, how many days does a one-point estimate indicate it will take to upgrade 256 mobile devices?
Answer Choices:
3245
Answer: 2
The project team is determining the duration for upgrading the software on the app used on its mobile devices. Using one-point estimating, how many days does it take to upgrade 384 mobile devices with four technicians?
Answer Choices:
5342
Answer: 3
A project manager is working on a large two-year project. At the end of the first year, the project is two months behind schedule because the interface programming is taking longer than planned. The sponsor will not extend the deadline or reduce the scope. What is the risk if the project manager compresses the schedule to meet the project deadline?
Answer Choices:
Improved quality of deliverablesReduction in reworkIncrease in total costsUse of fewer resources
Answer: Increase in total costs
A movie in production is scheduled for release in six months, which is next February. However, the studio wants to accelerate the schedule and release the movie this December in time for the holidays. The studio will not authorize increasing the movie’s budget. The project manager is responsible for the production schedule. Which compression technique can the project manager use with these constraints?
Answer Choices:
Fast-trackingDetermining the critical pathCrashingParallel processing
Answer: Fast-tracking